蜜臀av无码一区二区三区_天天爽天天爽夜夜爽国产自己精品 _色偷偷亚洲偷自拍_亚洲精品无码久久久久Av老牛

中文
Railway freight metering products - overload detection devices

Overloads are mainly installed at formation stations, section stations, and entry and exit signal locations at stations with cargo inspection operations. Used to determine if a railroad car is overloaded and off-loaded. It is an important equipment for the National Railway Group to control the safety of railway freight. The product is divided into normal over-deflection load applicable to trains of 60km/h and high speed over-deflection load of 100km/h. The over- and off-load detection device is mainly for monitoring and warning the over-weight, off-weight and off-load loading status of key cargoes (such as: coiled steel, glass, alumina, heavy rail, etc.) that are prone to tumbling, breaking, collapsing and crosstalk during railway wagon transportation, to prevent and eliminate to freight safety belt.

Procurement Consultancy

Email:huoanhr@yunda-tec.com

image_1630389561_Iek4Erk8.jpg